Staff Correspondent
Boro paddy sways in the gentle breeze of the haor, ready to be harvested in a few days. Yet, a road construction project is cutting through the heart of the haor, the lifeline of countless lives. The ongoing construction is destroying biodiversity and agricultural lands in the haor, executed by the current administration.
In Shangai Haor of Shantiganj upazila, Sunamganj, a 4-kilometer road is being built without compensating farmers for their land. No one has addressed the damage to the crops either.
Farmers and environmentalists claim that the road construction through the middle of the haor harms nature and the environment, destroys large tracts of arable land, obstructs water flow during the rainy season, and creates waterlogging upstream. Reports indicate that this destructive project is being carried out under the administration of the ruling Dr. Yunus.
According to the upazila administration, the road is being constructed in Shangai Haor under a special project of the Ministry of Disaster Management and Relief, with an estimated cost of approximately Tk 4 crore, funded by the Japan International Cooperation Agency (JICA). JB Innovation, a Dhaka-based contracting firm, is implementing the project. Excavators have been used to cut soil from arable land for several days.
On-site inspections reveal that the road extends from the eastern village of Dungria through the haor to the western village of Hasanabad. This construction has damaged agricultural lands in Dungria, Hasanabad, and Jamalabaz villages, along with farmers in Ujanigaon, Mirzapur, and Fatehpur villages to the north. Soil is being dug from the paddy fields to elevate the road, with trenches being dug on either side, destroying approximately 100 feet of agricultural land.
Farmers stated that last year, when road construction was ongoing, affected farmers were compensated. However, with the Awami League no longer in power, no one is addressing their plight, and no compensation is being provided.
During the Awami League’s tenure, Prime Minister Sheikh Hasina ensured fair compensation for all projects, including infrastructure development. Farmers received three times the market value for land acquisition, and compensation was also provided for any structures. In some cases, disputes even reached court before construction began. Now, however, construction is proceeding without even informing landowners, let alone compensating them.
A farmer who lost over an acre of land lamented, “No one asked us before building the road. Now my land is gone, and the paddy is destroyed. We couldn’t even harvest it.”
Other farmers echoed similar complaints, saying their livelihoods depend on this land in the haor. Now, their crops are being buried under the road, with more land being lost due to soil excavation.
Ashraf Uddin, overseeing the excavation, claimed that a list of farmers affected by crop damage has been prepared for compensation.
However, Shantiganj Upazila Project Implementation Officer (PIO) Jahangir Alam stated that there are no allocations for land acquisition or compensation in this project. He also denied allegations of the work being executed by BNP members.
Shantiganj Upazila Nirbahi Officer (UNO) Sukanta Saha said JICA had likely assessed feasibility before the project began. He assured that any complaints would be forwarded to higher authorities and stated he had personally inspected the construction site.
Bijon Sen Roy, General Secretary of the Central Committee of the Haor Bachao Andolan (Save Haor Movement), said a similar road in Kishoreganj’s haor had sparked nationwide criticism. If such a road is built in Sunamganj, it will spell disaster for biodiversity, agriculture, and farmers. He called for immediate intervention from environmental advisors and the district administration.
Meanwhile, local online environmental activists have expressed outrage. Activist Biplob Sarkar said that in the past, so-called environmentalists would protest and criticize the government for such actions. Now, there is complete silence and no opposition, with foreign-funded environmentalists indulging in luxuries.
Sunamganj Deputy Commissioner (DC) Mohammad Elias Mia said he had sought details on the matter from the UNO. He emphasized that no work should harm the nature, environment, or farmers of the haor.

https://stapravda.ru/20221228/reyting_samyh_populyarnyh_hostingov_v_rossii_196445.html, рейтинг хостингов России подтверждает, что выбор надежного провайдера важен для бизнеса.